By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
World of SoftwareWorld of SoftwareWorld of Software
  • News
  • Software
  • Mobile
  • Computing
  • Gaming
  • Videos
  • More
    • Gadget
    • Web Stories
    • Trending
    • Press Release
Search
  • Privacy
  • Terms
  • Advertise
  • Contact
Copyright © All Rights Reserved. World of Software.
Reading: Why data centre investors are flocking to lagos coastline
Share
Sign In
Notification Show More
Font ResizerAa
World of SoftwareWorld of Software
Font ResizerAa
  • Software
  • Mobile
  • Computing
  • Gadget
  • Gaming
  • Videos
Search
  • News
  • Software
  • Mobile
  • Computing
  • Gaming
  • Videos
  • More
    • Gadget
    • Web Stories
    • Trending
    • Press Release
Have an existing account? Sign In
Follow US
  • Privacy
  • Terms
  • Advertise
  • Contact
Copyright © All Rights Reserved. World of Software.
World of Software > Computing > Why data centre investors are flocking to lagos coastline
Computing

Why data centre investors are flocking to lagos coastline

News Room
Last updated: 2025/04/01 at 7:17 AM
News Room Published 1 April 2025
Share
SHARE

To get a slice of Lagos’ booming data centre market—projected to reach 70 megawatts (MW) by 2027—global investors are pouring capital into Victoria Island and the Lekki Peninsula, two of the city’s most affluent urban neighborhoods. 

Thanks to its proximity to eight submarine internet cables, Lagos Island is positioned to become Africa’s second-largest data centre hub, trailing behind Johannesburg’s 200MW capacity. But the scramble for Lagos’ coastline reveals the promise and pitfalls of betting on Africa’s fragmented data economy.

The closer a data centre is to a submarine cable landing station (CLS), the faster data can travel, reducing delays. Coastal data centers are built near these landing stations to improve speed and efficiency. They also serve as backup hubs, keeping networks running even if inland connections go down, said Ayotunde Coker, CEO of Open Access Data Centre (OADC).

“It is the availability of infrastructure and proximity to landing stations and typical site selection parameters that make investors elect to build data centres in Victoria Island,” Coker told .

Google’s Equiano submarine cable, with a massive capacity of up to 144 terabits per second (Tbps), lands directly at OADC’s Tier III-certified, carrier-neutral facility in Lekki. Similarly, the MainOne submarine cable with a 10 Tbps is directly connected to the MDXi data centre, MainOne’s Tier III-certified facility in Lekki, Lagos.

Nigeria’s eight submarine cables—including Google’s Equiano and 2Africa—make landfall along the Lagos Island coastline, connecting to terrestrial fiber-optic networks for broader distribution. 

Ten of Nigeria’s 16 data centres are already concentrated in Victoria Island, Lekki, and Eko Atlantic City, and operators are racing to add more capacity. Projects under construction include Equinix’s 5MW facility, Kasi’s 5MW centre, Nxtra by Airtel’s 38MW data center, and Open Access Data Centre’s 24MW facility—all slated for completion by 2027. These new data centres, alongside ongoing developments across the country, will expand Nigeria’s total capacity from 64MW to approximately 200MW. By bringing data processing closer to users, these facilities will reduce delays, enhancing the performance of cloud services, streaming, and online gaming. The increased capacity will also improve network reliability, minimizing downtime and ensuring more stable connectivity.

Power, water, and urbanisation  

Investors are drawn not just by connectivity but by Lagos’ improving power infrastructure. As key urban hubs, Victoria Island and Lekki are designated “Band A” service areas, ensuring 20 to 24 hours of electricity daily—critical for data centre operations.

“Power infrastructure in the Lekki Corridor today and in the future is more robust than other parts of Lagos,” said Wole Abu of Equinix West Africa. 

Another reason for choosing coastal areas is access to water for cooling systems, which prevents overheating and maintains efficiency. In 2023, data centers globally consumed an estimated 309 million gallons of water per day—enough to supply 3.3 million people—and this demand is expected to rise to 468 million gallons daily by 2030 as more AI-driven data centers emerge.

The increasing investment in Lagos’s data centres reflects a global urbanization wave. A recent Bank of America Institute study identifies urbanization, aging populations, and evolving consumer behavior as key drivers of digital infrastructure expansion. The United Nations projects that by 2050, about 66% of the global population will live in cities, rising to 87% in developed nations, with Asia and Africa contributing 90% of this urban growth.

One of the ultra-urban areas, Eko Atlantic, is envisioned as a cutting-edge smart city with world-class infrastructure, high-rise buildings, luxury real estate, and advanced flood protection systems. Though still under development, it has attracted major data centre investments, hosting two hyperscale facilities—Africa Data Centres’ Tier III data centre and Nxtra by Airtel.

For now, Lagos’ coastline remains the hottest ticket in town if investors can navigate its tide. 

Here’s an opportunity to tell us how you feel about . Join other readers to take this 10-minute survey now. Fill it via this link.

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Twitter Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Don’t buy the Google Pixel 9a: 5 reasons to wait for the Pixel 10a
Next Article Samsung’s most powerful stick vac yet sucks for a different reason | Stuff
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

248.1k Like
69.1k Follow
134k Pin
54.3k Follow

Latest News

The Great Office Debate: Are RTO Mandates Really About Collaboration or Control? | HackerNoon
Computing
Samsung Galaxy Watch owners may have to pay extra for health features soon | Stuff
Gadget
Watch this person play The Witcher 3 on their Galaxy Watch Ultra
News
Apple updates iPhone, iPad pages with these labels to comply with eu rules
Software

You Might also Like

Computing

The Great Office Debate: Are RTO Mandates Really About Collaboration or Control? | HackerNoon

7 Min Read
Computing

Google Adds Multi-Layered Defenses to Secure GenAI from Prompt Injection Attacks

7 Min Read
Computing

AMD GFX1250 Support Starts Being Built Up Within LLVM

2 Min Read
Computing

Apple’s iPhone 18 to feature TSMC’s 2nm chip next year · TechNode

1 Min Read
//

World of Software is your one-stop website for the latest tech news and updates, follow us now to get the news that matters to you.

Quick Link

  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact

Topics

  • Computing
  • Software
  • Press Release
  • Trending

Sign Up for Our Newsletter

Subscribe to our newsletter to get our newest articles instantly!

World of SoftwareWorld of Software
Follow US
Copyright © All Rights Reserved. World of Software.
Welcome Back!

Sign in to your account

Lost your password?