By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
World of SoftwareWorld of SoftwareWorld of Software
  • News
  • Software
  • Mobile
  • Computing
  • Gaming
  • Videos
  • More
    • Gadget
    • Web Stories
    • Trending
    • Press Release
Search
  • Privacy
  • Terms
  • Advertise
  • Contact
Copyright © All Rights Reserved. World of Software.
Reading: A 1,500-ton tunnel boring machine is already traveling to Madrid to drill the new Line 11
Share
Sign In
Notification Show More
Font ResizerAa
World of SoftwareWorld of Software
Font ResizerAa
  • Software
  • Mobile
  • Computing
  • Gadget
  • Gaming
  • Videos
Search
  • News
  • Software
  • Mobile
  • Computing
  • Gaming
  • Videos
  • More
    • Gadget
    • Web Stories
    • Trending
    • Press Release
Have an existing account? Sign In
Follow US
  • Privacy
  • Terms
  • Advertise
  • Contact
Copyright © All Rights Reserved. World of Software.
World of Software > Mobile > A 1,500-ton tunnel boring machine is already traveling to Madrid to drill the new Line 11
Mobile

A 1,500-ton tunnel boring machine is already traveling to Madrid to drill the new Line 11

News Room
Last updated: 2025/10/16 at 1:07 PM
News Room Published 16 October 2025
Share
A 1,500-ton tunnel boring machine is already traveling to Madrid to drill the new Line 11
SHARE

“Notify when you leave and when you arrive”

Mayrit has already done the first. The second will be in more or less a month when all the pieces are already on Spanish soil. Mayrit is not the youngest son of a family. Mayrit has many fathers and mothers. Many.

Those necessary to give life to a 1,500-ton tunnel boring machine.

That tunnel boring machine that will directly expand line 11 of the Madrid Metro. A line that, until now, has been excavated with much more traditional means and that of course will take a huge leap forward in its future projection with this gigantic and enormous artifact.

What’s coming, what’s coming

Connecting Cuatro Vientos, southwest of the capital, with Valedebebas, northeast of it, Line 11 wants to become one of Madrid’s star connections. Tracing a diagonal, the intention is to convert what is currently just seven stations into one of Madrid’s great corridors.

The qualitative and quantitative leap in the progress of the works will be made by Mayrit. This gigantic tunnel boring machine weighs 1,500 tons and is 98 meters long. It is expected that each day they can advance about 15 meters on the ground, key in a line that will have stations 33 meters below the Madrid soil.

My colleague Javier Márquez explained a few months ago that the transfer is not easy. The machine is built by Herrenknecht AG, a German company that has assembled the entire gigantic puzzle of pieces, screws and components in its country. Once assembled, the machine is cut into pieces to be sent to our country. Of course, “it won’t be quick or easy,” as my partner explained.

Now we know that the powerful tunnel boring machine has already set out on its way to Spain. It comes by land and sea. And the bulk of its pieces will arrive in Santander by boat where they will board land transport to reach the capital. Another good package of these pieces will arrive at the port of Valencia, originating in Venice.

Photo L11

Map of the new Line 11

Once the pieces arrive, they must be transported to Carabanchel. There, next to Plaza Elpítica, this monster will drill into the ground at a rate of 500 meters per month to connect with Conde de Casal, about six kilometers from the point of origin. This stage is considered one of the most problematic and complex. Until now, the connection between Parque de Comillas (which will have a new station) and Plaza Elíptica is being done by hand.

However, the transfer and assembly is so delicate and complex that it will not be until March 2026 when everything is expected to be ready in the Madrid neighborhood to begin drilling the ground.

The Madrid Metro has been without major investments for 20 years and that only means one thing: it is collapsing

The system is so complex because the tunnel boring machine is not only responsible for excavating the earth and disposing of what is found there. While working advancing into the subsoil, an auger transports the excavated material with a conveyor belt. This material can be washed if it encounters mud but it can also affect the stability of the ground with injections of bentonite, water or foam. All while sensors control the pressure the machine experiences to control how fast it can work.

If everything happens according to the planned deadlines, the last piece from Mayrit should arrive in December and, as we said, it is not expected to come into operation until March 2026. For now, it’s time to pull the shovel and pneumatic hammer.

Photo | Madrid Metro

In WorldOfSoftware | Faced with daily collapses, the Madrid Metro could increase frequencies or put in “pushers.” He has chosen the second

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Twitter Email Print
Share
What do you think?
Love0
Sad0
Happy0
Sleepy0
Angry0
Dead0
Wink0
Previous Article Switch Lite or scooter type gifts soon to be banned? Switch Lite or scooter type gifts soon to be banned?
Next Article You won’t find a better pet vacuum for £170 than this severely discounted Shark You won’t find a better pet vacuum for £170 than this severely discounted Shark
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

248.1k Like
69.1k Follow
134k Pin
54.3k Follow

Latest News

This mattress topper promises better sleep and less pain, but it’ll cost you
This mattress topper promises better sleep and less pain, but it’ll cost you
Gadget
Durable Functions and Werner Vogels’ Last Keynote: Highlights of AWS  re:Invent 2025
Durable Functions and Werner Vogels’ Last Keynote: Highlights of AWS re:Invent 2025
News
Top 17 African tech podcasts in 2025
Top 17 African tech podcasts in 2025
Computing
Apple Faces Scrutiny as Sanctioned Entities Slip Through App Store Controls
Apple Faces Scrutiny as Sanctioned Entities Slip Through App Store Controls
News

You Might also Like

Torrejón de Ardoz promised them happiness as the epicenter of the Madrid festivals. Until he started canceling them
Mobile

Torrejón de Ardoz promised them happiness as the epicenter of the Madrid festivals. Until he started canceling them

6 Min Read
Minecraft Rolls Out Its Final Update Of 2025 With New Mounts, Weapon, And Gameplay Tweaks
Mobile

Minecraft Rolls Out Its Final Update Of 2025 With New Mounts, Weapon, And Gameplay Tweaks

3 Min Read
AI can collapse the technology market
Mobile

AI can collapse the technology market

1 Min Read
Trump authorizes the export of NVIDIA H200 chips to China
Mobile

Trump authorizes the export of NVIDIA H200 chips to China

3 Min Read
//

World of Software is your one-stop website for the latest tech news and updates, follow us now to get the news that matters to you.

Quick Link

  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact

Topics

  • Computing
  • Software
  • Press Release
  • Trending

Sign Up for Our Newsletter

Subscribe to our newsletter to get our newest articles instantly!

World of SoftwareWorld of Software
Follow US
Copyright © All Rights Reserved. World of Software.
Welcome Back!

Sign in to your account

Lost your password?